HomeMy WebLinkAbout5-19 Naming of County Roads POLICY
Section Policy No. Page
aneehill Development Control 5-19 1 of 4
COUNTY Policy Title Date: Motion No.
Naming of County Roads March 23, 2021 141/21
Purpose:
To provide a policy for administering applications requesting the naming of County roads that are not part of
the existing Township, Range Road grid or are previously unnamed roads due to road diversions and service
roads formed on approved developments.
Policy Guidelines:
1. All County roads that are part of the Township, Range Road grid will be provided a number using a
rural addressing system. This will be their identifier and will not be considered to be renamed.
2. Applications will be considered for roadways that are:
a. Not part of the existing Township, Range Road grid
b. Unnamed roads due to road diversions
c. Approved development projects where a service road is required
3. Applications will be submitted on the prescribed form and directed to the Chief Administration Officer
or designate.
4. Names proposed for the above mentioned roadways shall meet one (1)or more of the following
criteria:
a. be positive in nature;
b. descriptive of an area;
c. in common use, and;
d. of regional significance or theme;
e. Use of family names might be restricted
5. The name of the road cannot be duplicated within the County.
6. All requests, in any case, will be subject to the approval of Council.
7. Proposed names will be circulated to internal County departments for comments or concerns.
Administration will work with the applicant to address any comments or concerns identified during the
referral process and to ensure that proper road name suffixes are applied (Appendix A).
8. Prior to proceeding with road naming, an advertisement shall be published in the local newspaper and
website to notify the public of the proposal.
9. Alberta Transportation shall be contacted regarding the supply and installation of road signs that are
to be placed adjacent to primary highways. All other road signs will be supplied and purchased by
Kneehill County.
10. Current approved Road Names are contained within "Appendix B".
11. Council may alter, modify, change or cancel names of roads and remove the signs whenever it is
deemed necessary.
POLICY
Section Policy No. Page
Development Control 5-19 2 of 4
Policy Title Date: Motion No.
II Naming of County Roads March 23, 2021 141/21
Responsibilities:
1. Council
a. The authority for naming a road.
2. Administration
a. Receive, review and circulate all naming proposals for roads and will prepare a report for
recommendation to Council for decision.
b. Maintain and update "Schedule A" attached to this policy.
c. Purchase and install signs and work with Alberta Transportation for signs that are to be placed
adjacent to primary highways.
d. Include officially designated road names on future editions of the County map.
0444
Jerry Wittstock, Mike Haugen,
Reeve CAO
Approved: March 23, 2021141/21
Review Date: March 23,2025
POLICY
Section Policy No. Page
Development Control 5-19 3 of 4
Policy Title Date: Motion No.
Naming of County Roads March 23, 2021 141/21
Appendix A: Common Road Suffix Definitions for Reference
Wherever possible, Administration will ensure that appropriate road name suffixes are applied and upheld
during the naming process.
Avenue AV A main road or thoroughfare
predominantly running in an east-
west direction
Close CL A road of relatively short length
closed on one end created by six
or more lot fronts
Crescent CRES A curved road connecting to an
adjacent road at both ends
Drive DR A meandering main road or
thoroughfare
Lane LN A road providing access or located
adjacent to a particular location.
Loop LOOP A road beginning and ending in
the same location.
Road RD A public or private thoroughfare
running in any direction as
defined in this document.
Street ST A main road or thoroughfare
predominately running in an
north-south direction
Trail TR A road indicating a heritage or
historical connection
Way WY A road which may change
direction beginning or ending at
the same location
POLICY
Section Policy No. Page
Development Control 5-19 4 of 4
Policy Title Date: Motion No.
Naming of County Roads March 23, 2021 141/21
Appendix B:
Twin Creek Close (The service road into Twin Creek Estates)
Access to Country Residential Properties off of Hwy 806, south of Linden (June 22, 2021)