HomeMy WebLinkAbout2004-04-06 Council MinutesKNEEHILL COUNTY COUNCIL MEETING MINUTES
April 6, 2004
X
L_J
N
MINUTES OF THE APRIL 6 2004 SPECIAL MEETING
OF THE COUNCIL OF KNEEHILL COUNTY AT THE
KNEEHILL COUNTY OFFICE, 232 MAIN STREET, THREE
HILLS ALBERTA
PRESENT.
Division No
6
Ken Hoppins, Reeve
PRESENT Division No
4
Murray Woods, Deputy Reeve
Division No
1
Brian Holsworth, Councillor
Division No
2
Carol Calhoun, Councillor
Division No
3
Jerry Wittstock, Councillor
Division No
5
Vern Crawford, Councillor
Division No
7
Ken Knievel, Councillor
ADMINISTRATION PRESENT
County CAO
Gene Kiviaho
Operations Director
Rob Mayhew
Interim Finance Director
Lavinia Henderson
Assessor
Frank Grills
EMS Coordinator
Mac deBeaudrap
Planner
Jeremy Fenton
Agricultural Fieldman
Bruce Sommerville
Transportation Secretary
Yvonne Evans
Recording Secretary Barb Long
OTHERS PRESENT.
Richard Marz, MLA
Cathy Prohl
Ted & Eleanor Stahl
Russ Evans
Paul DeVos
Debi Moon
Todd Simenson, Stantec Consulting
Mike Stefler, Stantec Consulting
1 Reeve Hoppins in the Chair:
CALL TO ORDER Reeve Hoppins called the meeting to order at 8 30 A.M advising
the objective of this special meeting of Council was to discuss the
Kneehill County Water Strategy
PRESENTATION 2. Presentation by Stantec Consulting Ltd (presentation
H2O STRATEGY attached and forming part of the minutes
STANTEC Todd Simenson, Stantec Consulting Ltd., reported that a
comprehensive report for the 2004 Kneehill County Water
Servicing Strategy evaluating water user surveys, existing
water sources, design criteria, public information
assessment, water service areas, options for capital
generation, and system ownership alternatives had been
supplied to Council and this presentation was to provide a
summary of this information for any interested parties
He further identified the following as the purpose of today's
Water Workshop and presented information to assist
Council in formulating a water strategy for the County
Reeve
CAO
KNEEHILL COUNTY COUNCIL MEETING MINUTES
April 6, 2004
• Present the final information contained within the
Kneehill County Water Strategy Report
• Review estimated connection costs an potential
financing options
• Identify ownership and operation alternatives
® • Present information on the Equity Water System
• Obtain feedback on the conclusions and
recommendations from the Water Servicing
Strategy
• Identify and discuss the proposed "Next Steps" that
Kneehill County can consider implementing as part
of their overall Water Servicing Strategy
The following information was included in the presentation
• Proposed Kneehill Regional Water Services Commission
Water Services Areas Kirkpatrick, Hesketh, Carbon,
' Swalwell, Acme Linden, Three Hills West
9
• Survey Results
• Summary of Connections by Water Service Area
• Potential Demands
• Summary of Potential Demands by Water Service Area
Conceptual Network of 7 Water Service Areas —100%
connected
• Optional Water Delivery Systems
Constant Flow —1 gal/minuter per residence
15 psi/mnumum pressure
cistern on site for storage
500 gal cistern provides 1 2 days storage
-' water pumped from cistern as required
Full Flow — 4 gal/minute per residence
30 psi/minimum pressure
no cistern large storage and pumping
facilities required off the regional
transmission line
larger piping required thus higher costs
higher risk of interruption
• Basis of Cost Estimate
450 miles (723 km) of pipe
1000 in of pipe per connection
constant flow = $25/linear in of pipe
full flow = $39/lmear in of pipe
pipe sizes 1 5" to 8 "
booster stations & reservoirs
crossings
air relief assemblies
contingency — 20%
{ system costs to curb stop
• Cost Estimates per Water Service Area
Constant flow— total $18,547,200 00
Full flow — total $28,236,500 00
• Connection Costs — All Water Service Areas (based on
60% connection)
Constant flow —Average $43,100
Full Flow — Average $65,500
2
Reeve
CAO
KNEEHILL COUNTY COUNCIL MEETING MINUTES
April 6, 2004
H
• Preliminary Cost Estimates & Possible Grant Funding
(one third and two third funding)
• Constant Flow Financing Option
• Full Flow Financing Option — cost per residence based on
using County Right of Ways and placement in quarter lines
• Constant Flow Financing Option — cost per residence based
on using County Right of Ways and placement in quarter
lines
• Typical Monthly Water Cost per Residence (family of 3)
Based on 29 3 cubic meters usage @$1 87 per cubic meter
to purchase H2O from the KRWSC and $0 40 per cubic
meter for operation and maintenance
Constant flow- no down payment $160.00/mo
$10,000 down $95 00/mo
Full flow — no down payment $207 00/mo
$10,000 down $143 00/mo
• System Ownership Options
1 Kneehill County Municipal Ownership —100%
ownership in all rural water distribution systems
2 Kneehill Regional Water Services Commission
Ownership — Commission is in place creates
County wide partnership with Villages and
existing Water Co op
3 Water Cooperative Ownership — cost recovery
basis, difficult to grow the system or combine
with others
4 Private Ownership — Corporations need a return
of 10% 15% on their investments
• Recommendations
1 Adopt policy to install Constant Flow systems for
all Water Service Areas (WSA), except possibly
Kirkpatrick
2 Pursue Federal and Provincial funding
opportunities, target for 2/3 of entire project
3 Engage public and appoint a Steering Committee
which would include a representative from each
WSA
4 Prioritize use of water based on current allocation
5 Consider sizing rural water distribution systems
based on 100% connection to accommodate
future growth
6 Develop an AEUB defendable Utility Rate Model
7 Partner with municipalities for bulk Water/Fire
Storage Facilities to increase level of service to
ratepayers
8 Consider forming Water Utility for ownership
and operation
9 Enter into supply contract with KRWSC
Next Steps — March 15, 2004 letter from Stantec lists
15 steps to be taken by the County (attached and
forming part of the minutes)
Equity Water Line
Mr Simenson reported the Equity Water Line had encountered
water pressure issues since the town of Troc u ^ d connected to
3
Reeve
QL
CAO
KNEEHILL COUNTY COUNCIL MEETING MINUTES
April 6, 2004
C7
11
this line In an attempt to level the water pressure on this line
Stantec had asked the town of Three Hills to reduce the flow to
Trochu. Stantec had not been successful in having this request
granted, and had provided the following recommendations and
options to Kneehill County to correct this situation
Short Term (2-3 months)
Option 1 Install a Variable Frequency Dnve(VFD)
at the Luoma Booster Station with the new VFD to
be able to reduce flows from 25L/second to 17 5
L/second as required ($17,300 00)
Option 2 Replace the existing Full Flow system at
Schimke's and Gustafson's with a Constant Flow
system ($8 000 00)
Mid -Term (3-12months)
Install mobile SCADA monitoring Equipment
($20,000.00)
Install isolation valve on Equity Booster Station
VFD ($3 200 00)
Install PRV Valves on Branches of Equity Water
Co op ($13,800.00)
Long Term (1 10 years)
Dedicated 150mm diameter water supply main to
Trochu from the Three Hills Equity Booster Station
($849,600.00)
Mr Simenson answered questions from those present and
agreed to provide copies of the presentation for distribution
to the public
The meeting recessed from 10.00 A.M until 10.25 A.M
153/04 Councillor Crawford moved that Council receive the final report
of the 2004 Kneehill County Water Servicing Strategy as prepared
by Stantec Consulting Ltd
CARRIED
Reeve Hoppins advised that Council is excited about the project
and wants to actively pursue, on a regional initiative or process
with all involved stakeholders, and will address some of the steps
today Council expressed the need to proceed immediately in
order to keep the momentum going
The 15 "Next Steps" identified by Stantec Consulting Ltd., were
reviewed by Council and the direction noted
Step 1 Confirm how to engage ratepayers and gain
commitment for project Consider establishing a Water Service
Steering Committee which includes Champion(s)/Local
Representatives in each WSA
Councillor Wittstock moved that Council approve in principle, the
concept of the formation of a Water Service Committee, consisting
154/04 of representation from each Water Service Area, Kneehill County
Council and Kneehill County Administration
CARRIED
4 /
Reeve
CAO
KNEEHILL COUNTY COUNCIL MEETING MINUTES
April 6, 2004
0
Council directed Administration to provide a draft "terms of
reference" for this Water Service Committee, at the April 13t'
Council meeting for Council consideration and the actual
formation of this Committee
Step 2 Confirm type of water system to be installed — Constant
or Flow System — Refer to Water Service Committee for
recommendation to Council
Step 3. Finalize proposed direction on establishing
connection fees — County Wide or per WSA — Council will address
after discussed by Water Service Committee
Step 4. Prioritize use of water based on allocation available
155/04 Councillor Woods moved the allocation of water be based on
people first for domestic use, then agricultural use for cattle swine
and poultry
CARRIED
Step 5 Establish ratepayer portion of funding model — Local
Improvement Bylaw Method or Capital Utility Investment Method
Council noted it would be premature to make a decision on this
step, but there would be a financing model in place when other
decisions had been made
Step 6: Confirm approach on ownership and operation of WSA's —
It was noted this would be a Council decision once all the
issues including legal liabilities, had been addressed
Step 7. Enter into a supply contract with the KRWSC — can
proceed once the KRWSC and Three Hills have established rates
Step g Distribute Capital Connection Fee/Operational Cost
Estimates to ratepayers to establish the commitment within each
WSA — refer to Water Service Committee and once have definite
numbers this can be addressed by Council
Step 9 Submit Report to Alberta Infrastructure and PFRA to
secure funding for entire project based on a four to seven year
program Target 2/3 funding for the project — refer to Water
Service Committee
Step 10. Prioritize WSA's based on commitment, need, and then
overall WSA costs based on funding availability and grant
allocations — refer to Water Services Committee
Step 11. Establish direction on how systems are to be sized _refer
to Water Services Committee
Step 12: Prepare a water utility rate model, considering AEUB
guidelines
Councillor Woods moved that Administration be directed to
156/04 proceed with the Water Utility Rate Model
CARRIED
5 `
Reeve
CAO
KNEEHILL COUNTY COUNCIL MEETING MINUTES
April 6, 2004
I
�J
1�
.7
Step 13• Develop Bylaws and Polices — referred to the Water
Services Committee for direction
Step 14 Discuss partnerships amongst other water providers and
consider one utility to own and operate all water systems — referred
to the Water Services Committee for direction
Step 15 Begin regulatory approvals and preliminary design — refer
to Water Services Committee — need for more information and
study
Council expressed the concern that ratepayers need to be aware the
water project will be proceeding quickly, and the County needs to
have people to assist with this process
Councillor Crawford thanked Stantec Consulting and
Administration for the time and effort spent in preparing the
Kneehill County Water Servicing Strategy
ADJOURNMENT The meeting adjourned at 1130 A.M
Z
Reeve
CAO
A r , "
Kneehill County
Water Servicing Strategy
Present the final information contained within the
Kneehill County Water Servicing Strategy Report.
Review estimated connection costs and potential
financing options.
Identify ownership and operation alternatives
Present information on the Equity Water System.
Obtain feedback on the conclusions and
recommendations from the Water Servicing
Strategy.
Identify and discuss proposed "Next Steps" that
Kneehill County can consider implementing as
part of their overall Water Servicing Strategy.
Kneehill County
Water Servicing Strategy
Kneehill County
Water Servicing Strategy
Eq
119
i
❑ Maybe
100
i
81
• NO
■ Yes
8p
❑ TOTAL
60
49
40
29
26
22
20
19
Mori
wr!t
0
E O L
e Y
N
U U
Y
V
�3
Y
d O
v C
C_
�
N d
c 3
Y
O N
•
9
a
Kneehill County
Water Servicing Strategy
Constant Flow = 1 igpm per household
MDD Flow based on per capita consumption
Kneehill County''
Water Servicing Strategy
6
Kneehill County
Water Servicing Strategy
Two Water Delivery System Options
Considered
Full Flow Full Pressure Delivery
System
Design Flow Rate: 4 igpm
Minimum pressure: 30 psi
Constant Flow Delivery System
Design Flow Rate: 1 igpm
Minimum pressure: 15 psi
Kneehill County
Water Servicing Strategy
1 igpm per residence
Minimum delivery pressure 15 psi
Cistern used to provide on site storage
1-2 day storage provided (based on 500 gal
cistern)
Water is pumped from cistern
- -- -- _AW
Kneehill County
Water Servicing Strategy
4 igpm per residence
Minimum delivery pressure 30 psi
No cisterns required
No pumping required in homes
Large storage and pumping facilities
required off site
Requires larger piping
Higher cost than Constant Flow System
Higher risk of Service Interruptions
Kneehill County
Water Servicing Strategy
723 km (450 miles) of pipe
1000 m of pipe per connection
Constant Flow = $25 / lin.m of pipe
Full Flow = $39 / lin.m of pipe
Pipe sizes: 1.5" to 8"
Booster Stations & Reservoirs
Crossings
Creeks, Roads, Rail
Utilities & Pipelines
Air relief assemblies
Contingency — 20%
System costs to curb stop
Ca
Water Service
Area
Number of Total Cost
Existing Constant Flow
Potential 0 igpm)
Connections
Total Cost
Full Flow
(4 igpm)
Kirkpatrick WSA
28
$359,600
$631,000
Hesketh WSA
58
$1 510 100
$2,727 800
Carbon WSA
101
$2,668,100
$3,862,900
Swalwell WSA
107
$2,460,800
$4 149 900
Acme WSA
110
$3 179 600
$5,184,300
Linden WSA
176
$3,615 400
$5 133,600
Three Hills West
138
$4,753,600
$6,547 000
Total Cost for WSR
718
$18,547 200
$28,236,500
N
0
�a
A
NA
0
Maximum
Average
Average WSA
Average WSA
Payment Options
%Connection
WSA
WSA
Contion Fee
Connection Fee
Connection
Connection j,neC
/3 Funding
2/3 Funding
Fee
Fee
100%
$34,400
$25,800
$17,200
$8,600
Total Cost
60%
$57,400
$43,100
$28,733
$14,367
Monthly Payment Plan
100%
$221.64
$166.23
$110.82
$55.41
No Down Payment
60%
$369.83
$277.69
$185.13
$92.56
100%
$189.42
$134.01
$78.60
$23.19
$5,000 Down Payment
60%
$337.61
$245.48
$152.91
$60.35
100%
$157.21
$101.80
$46,39
$0.00
$10,000 Down Payment
60%
1 $305.40
1 $213.26
$120.70
$28.13
N
Payment
Options
%Connection
Maximum
WSA
Connection
Fee
Average
WSA
Connection
Fee
Average WSA
Connection
Fee 1/3
Funding
Average WSA
Connection Fee
2/3 Fundin
100%
$47,400
$39,300
$26,200
$13,100
Total Cost
60°%
$79,100
$65,500
$43,667
$21,833
Monthly Payment
Plan
No Down
100%
$305.40
$253.21
$168.81
$84.40
Payment
60%
$509.64
$422.02
$281.34
$140.67
$5,000 Down
100%
$273.18
$221.00
$136.59
$52.19
Payment
60%
$477.43
$389.80
$249.13
$108.46
$10,000 Down
100%
$240.97
$188.78
$104.38
$19.97
Payment
60%
$445.21
$357.59
$216.91
$76.24
3
0
Kneehill County
Water Servicing Strategy
Kneehill County Municipal Ownership
"... in the interest of public safety, Kneehill County will develop a plan
to assume an ownership role in all rural water distribution systems..."
May 14, 2002 unanimous motion by Kneehill County Council
KRWSC Ownership
Commission is in place, creates County wide partnership with
Villages and existing Water Coop
Water Cooperative Ownership
Cost recovery basis, difficult to grow the system or combine with
others
Private Ownership
Corporations need a return on their investment -10 -15%
Kneehill County-}
Water Servicing Strategy;
J
43 Us for the County is available from the KRWSC.
Public interest in this project is high ( approx. 60%).
Ratepayers want an economical and reliable source of
high quality water.
Seven main WSA were identified based on hydraulics,
economics and topography from KRWSC.
2004 capital cost estimate for this project is
$18,600,000 — Constant Flow System
$28,250,000 — Full Flow System
KRWSC Transmission cannot supply instantaneously
4 igpm to all users for a Full Flow System.
Minimum 60% connection rate required for economical
system
Kneehill County
Water Servicing Strategy
County to consider connecting Hamlets such as Swalwell
and Torrington to WSA Water systems.
All rural water lines in each WSA are Class 1 pipelines as
defined by EPEA.
West Three Hills WSA water supply to be confirmed from
either Town of Three Hills and/or KRWSC.
Future connections built into hydraulic analysis of
system.
The typical cost for a family of 3 based on $10,000 down
payment financed over 25 years @ 6%, 2/3 grant funding,
60% connection rate, cost of water $1.8731M3, and $0.40/
m3 is $94.60 for a Constant Flow system and $142.71 for a
Full Flow system.
Kneehill County
Water Servicing Strategy
Adopt policy to install Constant Flow Systems for all
WSA's except possibly Kirkpatrick WSA
Pursue Federal and Provincial funding opportunities for
long term grant funding (target 2/3) for entire project
Engage public and officially appoint a Steering Committee
which would include representation from each WSA
Prioritize use of water based on current allocation
Consider sizing rural water distribution systems based on
100% connection to accommodate future growth
Develop an AEUB defendable Utility Rate Model
Partner with existing Municipalities for Bulk Water/Fire
Storage Facilities to increase level of service to ratepayers
Consider forming Water Utility for ownership and operation
Kneehill County
Water Servicing Strategy
Confirm how to engage ratepayers and gain commitment for
project. Consider establishing WSS steering committee which
includes Champion(s)/Local Representative(s) in each WSA
Confirm type of water system to be installed -- Constant or Full
Flow System
Finalize proposed direction on establishing connection fees —
County Wide or per WSA
Prioritize use or water based on allocation available
Establish ratepayer portion of funding model — Local
Improvement Bylaw Method or Capital Utility Investment Method
Confirm approach on ownership and operation of WSA's
Enter into a supply contract with the KRWSC
M Distribute Capital Connection Fee/Operational Cost Estimates to
Ratepayers to establish commitment within each WSA
Kneehill County
Water Servicing Strategy"
p<
Submit Report to Al and PFRA to secure funding for entire
project based on a four to seven year program. Target 2/3
funding for project.
Prioritize WSA's based on commitment, need and then overall
WSA costs based on funding availability and grant allocations
Establish direction on how systems are to be sized (ie: 100%
future connection or less)
Prepare a water utility rate model. Consider AEUB guidelines
Develop Bylaws and Policies
Discuss partnerships amongst other water providers and
consider one utility to own and operate all rural water systems
Begin regulatory approvals and preliminary design
11
m
J
+J
J
r
W
A
11
•
0
Council Agenda Item #6(g)
TO. Gene Kiviaho
Reeve Hoppms
Members of Council
FROM Rob Mayhew
DATE April 6, 2004
Issue New Signs
Background Signs with new County log identified in the 2004 budget
$35,000 00
2 at each end of Hwy 21, 2 at each end of Hwy 27, 1 at Hwy 575 by
Drumheller 1 on the Office and 1 on the Shop
Discussion Copies of sign designs handed out for review
Sample costing Option #1 for 1 sign
NOTE (Sign Posts — consist of 2-3post sets @ $482.42each = $964.84 per sign)
$2,951 08 plus 2 sign post sets $964.84 = $3,915 92
7 large signs @ $3,915 92 = $27,411 44
50 small signs@ $55 69 = 2,784.50
Total $30,195 94
Financial Implications
Total cost of signs = $30 195 94
Recommendation
1 That Council approve the Option #1 design for the large signs
2 That Council approve the purchase 7 large signs/posts and 50 small signs that
ve the new County logo
I
Rob M yh Gene viaho
Public Works Superintendent CA
50
LJ
L.J
•
Council Agenda Item # 7(a)
TO Gene Kiviaho
Reeve Hoppins
Members of Council
FROM Rob Mayhew
DATE- April 6, 2004
Issue Jonathan Bowman request for Equity Water Hook Up
for NW 6 32 23 W4 Subdivision
Background
At the October 8, 2002 Council Meeting a motion was made in regards to the
Equity Water Distribution System "that any further applications be held
pending the completion of the Water/Wastewater Study "
Mr Bowman had been sent a letter from the County in response to his request to
connect a subdivision development to the Equity System stating that Kneehill
County was in water contract negotiations with the Town of Three Hills and
would contact him when a contract settlement had been reached on the Equity
Water System On March 14, 2004, another letter was received from Mr Bowman
again requesting hook up to the Equity Water System stating that he had been in
discussions with the Town of Three Hills and they had no issue with Kneehill
County adding this subdivision to the Equity Water System even though there is
not a current contract in place A reply letter was sent to Mr Bowman on April 1,
2004 stating that the negotiations with Three Hills are continuing and we would
contact him when a contract settlement had been reached
Discussion
There are other problems identified as well as ongoing dscussions with the Town
of Three Hills on the Equity Water System The issues with the exisiting hook ups
are no water at times, changes in pressure and line breaks Stantec Engineering
has just completed a Water Strategy Study for the County which will be reviewed
at the April 6 2004 Special Council Meeting
Financial Implications
Recommendation
1 That Council reconfirm their position on that any further hook-ups be held
un 1 the issues with the Equity Water System are addressed.
Rob Ma e Ge e iviaho
Public Wor Superintendent CAO
57