HomeMy WebLinkAbout1994-10-31 Council Minutest
A
kw'
MW
SPECIAL COUNCIL MEETING OCTOBER 31st, 1994
A special meeting of council was held on Monday, October
31st, 1994, commencing at 7.00 P M.
The following were present for the meeting-
Reeve: Richard A Marz Division Four
Councillors
Marylea Lowen
Otto Hoff
Robert E. Boake
James Hanger
(after 7 08 P M )
Richard M Vickery
Glen Wagstaff
Division One
Division Two
Division Three
Division Five
Division Six
Division Seven
John C. Jeffery, Municipal Administrator and Alex
Cunningham Utility Officer were also present for the
meeting
Bill Maher and Mike Schaalje from the engineering firm of
Lee Maher were also present
Reeve Marz noted he had called the special meeting in order
to discuss the Equity water project and each councillor had
been notified in writing of the date, time and place for
the meeting. Each councillor also signed a letter
consenting to holding this meeting
Mr Cunningham explained the material and construction bids
which closed last Tuesday.
Councillor Hanger entered the meeting at 7 08 P M
Mr Cunningham noted the original cost estimate done in
March of 1994 was $498,000 for 28 services and 21 km of
line
The project was tendered out and two bids were received.
Low Construction bid $437,440
Low material bid $210,000
G S T net cost $ 20,000
Contingency $ 7,560
Engineering $ 75,000
Total cost $750,000
This would be for 28 km of line and 37 hookups
If the M D undertakes the construction cost breakdown
would be
95,000 feet - at 1000 feet per day 95 days
760 hours at $75 00 per hour - high hoe $57,000
760 hours at $37 00 per hour for traxscavator $28,120
100 hours at $66 00 per hour for grader $ 6,600
1
10
Ln
SPECIAL COUNCIL MEETING OCTOBER 31st, 1994
Labour
Pump
G S T Contingency, & Engineering
Total
Material - $210,000 less P E to PV
Railway and Highway crossings
Total
Maximum cost $500,000
Recovery of Costs 37 services at $10,000
P.F.R.A Grant
$38,000.
$15,000
$85,000
$229,720
$190,000
$ 30,000.
$449,720
$370,000
$100,000
Any new hook up would have to pay $10,000 plus M D hook
up costs to get line in to an internal property location
plus a share of any overrun incurred for the project
Mr Cunningham noted
Bearspaw system cost $14,000 for a hook up plus $60 00 per
month North Springbank cost between $10,000 and $12,000
per hook up P V C price gone up 30% this year
Not planning on paying any landowner for the pipeline
crossing their land There is a possible 15 more hookups
(over the original 37 hookups
Contract price would cover bringing the line 3 meters
inside property line only
There are 3 options - Do the project by contract,
M D do the work or do nothing
He obtained prices for a new high hoe as follows
J D hoe 690 E $179,500 or $6500 00 per month to rent
with $55,000. of the rental applied to purchase price of
hoe.
Wajax - $176,500 or $6750 per month to rent with all
rental applied to purchase price
Also Wajax has a used hoe on hand with 600 hours on it
There was general discussion about this project and the
proposed by law was reviewed
Mr. Boake moved first reading to by -law 1319, this being a
by -law to authorize the supply and construction of the
Equity Water Project as a Local Improvement and to impose a
Special Local Benefit Assessment with respect to the local
improvement
CARRIED
Mrs Lowen moved the Reeve and Municipal Administrator be
authorized to sign any required pipeline crossing
agreements required for this project.
CARRIED
Mr Wagstaff moved this special meeting of council do now
adjourn
CARRIED
Time 8.25 P M
2
e
ROAD COMMITTEE TOUR MONDAY, OCTOBER 31st, 1994
The Road Committee of Richard M Vickery, Otto Hoff
and Lonnie McCook, Acting P W S met on Monday,
October 31st and reviewed the following projects and
made the following recommendations
1 4- 33- 31 -22 -4 - Canadian 88 Road Approach
Required extra culvert and more dart
Company advises road approach was brought up to
M D standards
If satisfactory should be written off
Road approach is okay to write off
2 WNW 36- 31 -22 -4 - Frank Hugo Request for move of a
road approach See notes re. location and previous
move of road approach done some years ago to its
present location Mr Hugo is asking to have
it moved back to previous location Is this
up to the MD ?
Recommend the M D not approve any approach
changes Perhaps can address the house approach
problem with a clam dump when gravelling road
3 Request from D R Hurl on behalf of Gulf Canada
to make use of existing road approach which access
on to SR 837 from 1- 35- 30 -22 -4
Council must approve approaches which access on
to secondary roads and also approve approaches if
use is changed
Will be more traffic as a result of the oil well
Also should check to ensure there is adequate
sight distance
Recommend the company be allowed to make use of
the existing approach
4 Request from D R. Hurl on behalf of Gulf Canada
to make use of existing road approach which
accesses on to SR 836 from 11- 29- 30 -22 -4
Council must approve approaches which access on
to secondary road and also approve approach if
use is changed Will be more traffic as a
result of the oil well Also check to ensure
there is adequate sight distance
Recomend the company be allowed to make use of
1h, h �
Y
G o$� 4- ri � � • a
tett� V,
+tX
A
I?q
the existing approach
5 Mark Andrews - Road Allowance WSW 28- 29 -21 -4 -
Inspect road allowance to ensure same is open for
public use Check re: removal of texas gate from
road - is road in reasonable shape? Has it been
re- gravelled where the gate was removed?
Recommend okay to write off - road looks good
6 Pan Canadian - Wellsite - 8- 25- 28 -22 -4
Does it appear the well site will be permanent?
If so has the company installed permanent warning
signs as per letter sent to company August 26th
Nothing done at this site as yet
7 Wayne Dresser - NW 20- 28 -22 -4 - Wash out along
side of road - Work was being done last April
when committee went by location
Have another look now and if project completed
see if it can be written off
Recommend okay to write off
8 Midas Resources - Midas did some road improvement
work to access well on 4- 14- 29 -24 -4
Road did not meet standards Company came back in
July to fix up the road
Robert Elliott were upset because of possible crop
loss Crop likely planted on road allowance?
If road now is completed and meets M D standards
should be written off
Also committee should inspect area to see if two
texas gates have been installed by company as per
their request
If both gates installed satisfactorily council
will have to pass by -laws to approve texas gates
See file for more information
One texas gate installed No gravel on road
Road is in poor shape Ditches need work
Was a letter sent to the company setting a for
final completion date?
Feel the company never took crop from landowner
9 Ditch Cleaning Project - East of 26 & 35 in
30 -24 -4 No compensation agreements arranged
with four land owners work only to be done
��e�
0
Cl
M
on west side of the road - has the work been
done? If satisfactory should be written off
Recommend project be written off
Also looked at following projects:
10. Allan Garson - Tractor sitting on M D road
approach Been there for ?many years
Has any letter been sent to Mr Garson to
remove the tractor? Approach is located
immediately across from Victor Garson s
house approach
11 Range Road 22 -4, Township Road 28-2 -
Recommend a blade grade be constructed
if the well is a producer and will be
permanent Site is right off #9 going north
1/4 of a mile The company is using existing M D
road allowance
12 Also looked at the Linden Church Road and
Linden Home Roads -
Both roads are satisfactory and the construction
jobs can be written off