HomeMy WebLinkAbout1992-08-19 Council MinutesROAD COMMITTEE TOUR AUGUST 19TH, 1992
The Road Committee of Otto Hoff, Lawrence Hogg and John C
Jeffery met on Wednesday August 19th, 1992 They reviewed
the following projects
1 Reviewed Requests re. signs at NW 24- 31 -23 -4 and
West of 9- 34 -23 -4
Recommend no change in controlled intersections
Further recommend a policy of all gravel to gravel
roads - have yield signs - and gravel to pavement
or pavement to pavement have stop signs
!� (Could be exceptions for extreme visability problems)
2 Main Crew SR 836 - from SR 585 South - Road is 39
feet wide Okay to write off 4 2 KM project except
as follows:
Pull survey stakes, pick up rocks, fencing, signs,
pavement to be completed, debris pile to be cleaned up
south of Frankes on west mile. Power poles to be
moved to road allowance and brush to be removed
from around power pole
3. Renaissance 11- 18- 33 -22 -4 - Approach must be paved
south from existing approach to the 3rd power pole
south or go thru farm yard
4 Gibbs - E 10- 30 -26 -4 Robert Boake wants to discuss his
request re drainage problem
5. Renaissance 8- 35- 34 -22 -4 - Approach must be located
approximately 100 meters south of where they wish to
have it, to top of hill across from existing
approach on east mile
6 Remove weight restriction signs and post from
Buffalo Jump Road.
7. Pavement in poor condition on east end of Buffalo
Jump Road
8 Brushing required by hand or machine from Bill Ottosen
on Buffalo Jump Road north to Texas Gate West of
25- 34 -23 -4
9 Trochu West road - west of Cunningham 2 bad spots
10 Request for Blade grade ESE 3- 33 -24 -4 2 3 KM
2 gas lines involved
Can see no reason for blade grade
11 Base course crew - discuss with Oris.
12 Vickery Bridge - see note from Torchinksy
13 West of 23- 29 -24 -4 one time gravel completed
2 0 KMS - Should have curve signs now that the
road is gravelled
14 West of 24- 29 -24 -4 - One time screenings 1 0 KM okay to
write off
15 Culvert Installation NW 14- 28 -22 -4 - Okay to pay $44 00
damages on 0 11 acres borrow pit - grass damage and k
1 �
•
0
P
ROAD COMMITTEE TOUR AUGUST 19TH, 1992
ii general land damage Grader to grade road and clean up
field cuts a bit and Art to seed
16 Need to see Lonnie Tuesday re: completion date on SR
836
17 Lewis Malaka Road - what are the ridges all about?
Require culvert extension and widening of Lewis
Malaka approach south to power pole
18. Reviewed balance of road - South of 29- 31 -21 -4 - Agreed
we will survey correctly when Bev Malaka signs
agreement Already approved - June 9th, 1992 - page 6
19 Approach SR 575 - SW 26- 29 -22 -4 - Okay to write off
20. Approach - Earl Penner - Swalwell - okay to write off.
21 Approaches NW 7- 30 -24 -4 - Approaches in place as
per plans Appear to be adequate for proposed
subdivision
22 Helen Lowen/ Andrews Access - Road Committee did not
see her Feel situation is private matter between
Andrews and Mrs Lowen Council has already
decided will not be involved
23 Patch Project SE 5- 32 -22 -4 - Okay to write off.
24. Patch Project S of 3- 32 -24 -4 - Okay to write off
Items Not Yet Completed.
1 SR 836 - Main Crew
2 SR 582 - Base Crew
3 Hoppins SW 13- 34 -25 -4
4. NW 24- 31 -22 -4 - blade grade
5 NE 2- 32 -23 -4 - blade grade
6 West of 12- 33 -23 -4 blade grade
7 Andy Silver driveway
8. Texas Gate - Randy James - NE 8- 29 -21 -4
(Otto has forms and will try to get Mr
sign road access agreement first)
9 Complaint West of 6- 30 -22 -4
10 SR 837 - Contractor
11 Rodomske Approach
John C ftef , Municipal Administrator
E
James to