Loading...
HomeMy WebLinkAbout1986-11-21 Council Minutes0 • ROAD COMMITTEE TOUR NOVEMBER 21ST, 1986 ---------------------------------------- ---------------------------------------- PRESENT ROBERT E. BOAKE, BRUCE HASTIE, J. C. JEFFERY 1 STAN MILAN BALES WEST 21- 31 -22 -4 - NOT REMOVED 2. DUST CONTROL - HUXLEY & DAVIDSON - ROAD WAS BARE AND NO POT HOLES, WAS DUSTING IN SOME SECTIONS OF GRAVEL ROAD BUT NOT ON APPLIED AREAS 3. SR 837 - ORKNEY ROAD - PRETTY WELL RIPPED UP EXCEPT FOR NORTH 2 OR 3 MILES LOOKS IN GOOD SHAPE FOR WINTER, BUT NOT COMPLETE 4 BLERIOT FERRY HILL - NO SURVEYING AS YET. FEW STAKES BUT NOT COMPLETE. 5 REVIEW BRITISH PETROLEUM RESOURCE REQUEST FOR DRILLING ON ROAD ALLOWANCE BETWEEN 17 & 18 IN 30 -21 -4- IS DEVELOPED ROAD NO WAY DRILLING OPERATION COULD BE COMMENCED. 6 REVIEWED SURFACING AND SIGNING ON SR 575 EAST END NO SURFACING COMMENCED AS YET PAVEMENT END SIGN REQUIRED ON SR 575 WEST END HEADING EAST NEAR BRIDGE. ALL OTHER SIGNING APPEARS ADEQUATE. CHECK OUT 80 KM SPEED SIGN COMING DOWN HILL AS ADVISED BY FINLAY SHOULD BE 100 KM SIGN 7. LOWEN PIT ROAD WEST OF 16 AND 21 IN 29 -21 -4 - ROAD WIDTH AND CONSTRUCTION GOOD SMALL AMOUNT OF CLEAN UP REQUIRED BY DIVISIONAL GRADER IN SPRING BACKSLOPES ARE NOT 5 1 BUT FELT IS ADEQUATE FOR TYPE OF ROAD. 8 KIRBY LAND SECTION 25- 28 -22 -4 - APPEARS TO BE NO LEGAL OR PHYSICAL ACCESS TO NW 25 EXCEPT THROUGH NE 25 9. SCHRAMM COULw'E PROJECT - OKAY FOR WINTER - ADVISE MRS KERNICK WHEN PAYING WE WOULD LIKE TO PURCHASE FENCED OFF AREA FROM HER AT TIME OF FINAL GRADING AREA CURRENTLY 131 FEET X 128 FEET ABOUT - 38 ACRES LEAVE WEST APROACH IN AT TOP OF HILL AND FENCE OFF OTHER APPROACH AREAS GRADER TO LEVEL OFF BERME AREA FENCING REQUIRED SOUTH SIDE OF DITCH - COME ACROSS CREEK STRAIGHT TO OTHER EAST FENCE WHERE DITCH TURNS SOUTH FENCING NEEDS TO BE COMPLETED AT SCHRAMM AND CAMPBELLS AS WELL. 10. CHRISTIE PROJECT - OKAY TO WRITE OFF FIRST 2 MILES FROM NUMBER 27- GENERAL CLEAN UP AND ROCK PICKING REQUIRED IN SPRING 11 BLAIR PROJECT - OKAY TO WRITE OFF SOUTH HALF MILE GENERAL CLEAN UP REQUIRED WHEN COMPLETING 2ND HALF MILE IN 1987 12 BIGELOW LOW LEVEL CROSSING - SE 3- 34 -25 -4 - CEMENT TO BE INSTALLED IN SPRING - CROSSING VERY ROUGH. 13 BEAVER PROBLEMS TO BE SOLVED WEST OF 31- 33 -25 -4 - AND WEST OF 4- 31 -22 -4. 14 PETERS BRUSHING - SSW 1- 34 -26 -4 - UP TO BRUCE HASTIE TO LOOK AFTER SEEING BOB PETERS 15 LEISCHNER PROJECT - SE 14- 33 -26 -4 - NOT COMPLETE 16. DANN BEAVER PROBLEM HAS BEEN RECTIFIED NW 30- 32 -24 -4 17 GEORGE BOLES RUBBLE PILE SW 16- 32 -24 -4 - NOT CLEANED UP WHAT ARE YOUR WISHES 18 BRUCE HASTIE REQUESTS ROAD NEAR LYDIA MARTENS BE ADDED TO BRUSHING PROGRAM - 2 MILES SOUTH OF BOB PETERS -NORTH SOUTH AND EAST CORNERS NW 24- 33 -26 -4