ROAD COMMITTEE TOUR NOVEMBER 21ST, 1986
----------------------------------------
----------------------------------------
PRESENT ROBERT E. BOAKE, BRUCE HASTIE, J. C. JEFFERY
1 STAN MILAN BALES WEST 21- 31 -22 -4 - NOT REMOVED
2. DUST CONTROL - HUXLEY & DAVIDSON - ROAD WAS BARE AND NO POT
HOLES, WAS DUSTING IN SOME SECTIONS OF GRAVEL ROAD BUT NOT ON
APPLIED AREAS
3. SR 837 - ORKNEY ROAD - PRETTY WELL RIPPED UP EXCEPT FOR NORTH
2 OR 3 MILES LOOKS IN GOOD SHAPE FOR WINTER, BUT NOT COMPLETE
4 BLERIOT FERRY HILL - NO SURVEYING AS YET. FEW STAKES BUT NOT
COMPLETE.
5 REVIEW BRITISH PETROLEUM RESOURCE REQUEST FOR DRILLING ON
ROAD ALLOWANCE BETWEEN 17 & 18 IN 30 -21 -4- IS DEVELOPED ROAD NO
WAY DRILLING OPERATION COULD BE COMMENCED.
6 REVIEWED SURFACING AND SIGNING ON SR 575 EAST END NO
SURFACING COMMENCED AS YET PAVEMENT END SIGN REQUIRED ON SR 575
WEST END HEADING EAST NEAR BRIDGE. ALL OTHER SIGNING APPEARS
ADEQUATE. CHECK OUT 80 KM SPEED SIGN COMING DOWN HILL AS ADVISED
BY FINLAY SHOULD BE 100 KM SIGN
7. LOWEN PIT ROAD WEST OF 16 AND 21 IN 29 -21 -4 - ROAD WIDTH AND
CONSTRUCTION GOOD SMALL AMOUNT OF CLEAN UP REQUIRED BY
DIVISIONAL GRADER IN SPRING BACKSLOPES ARE NOT 5 1 BUT FELT IS
ADEQUATE FOR TYPE OF ROAD.
8 KIRBY LAND SECTION 25- 28 -22 -4 - APPEARS TO BE NO LEGAL OR
PHYSICAL ACCESS TO NW 25 EXCEPT THROUGH NE 25
9. SCHRAMM COULw'E PROJECT - OKAY FOR WINTER - ADVISE MRS
KERNICK WHEN PAYING WE WOULD LIKE TO PURCHASE FENCED OFF AREA
FROM HER AT TIME OF FINAL GRADING AREA CURRENTLY 131 FEET X 128
FEET ABOUT - 38 ACRES LEAVE WEST APROACH IN AT TOP OF HILL AND
FENCE OFF OTHER APPROACH AREAS GRADER TO LEVEL OFF BERME AREA
FENCING REQUIRED SOUTH SIDE OF DITCH - COME ACROSS CREEK STRAIGHT
TO OTHER EAST FENCE WHERE DITCH TURNS SOUTH FENCING NEEDS TO BE
COMPLETED AT SCHRAMM AND CAMPBELLS AS WELL.
10. CHRISTIE PROJECT - OKAY TO WRITE OFF FIRST 2 MILES FROM
NUMBER 27- GENERAL CLEAN UP AND ROCK PICKING REQUIRED IN SPRING
11 BLAIR PROJECT - OKAY TO WRITE OFF SOUTH HALF MILE GENERAL
CLEAN UP REQUIRED WHEN COMPLETING 2ND HALF MILE IN 1987
12 BIGELOW LOW LEVEL CROSSING - SE 3- 34 -25 -4 - CEMENT TO BE
INSTALLED IN SPRING - CROSSING VERY ROUGH.
13 BEAVER PROBLEMS TO BE SOLVED WEST OF 31- 33 -25 -4 - AND WEST
OF 4- 31 -22 -4.
14 PETERS BRUSHING - SSW 1- 34 -26 -4 - UP TO BRUCE HASTIE TO LOOK
AFTER SEEING BOB PETERS
15 LEISCHNER PROJECT - SE 14- 33 -26 -4 - NOT COMPLETE
16. DANN BEAVER PROBLEM HAS BEEN RECTIFIED NW 30- 32 -24 -4
17 GEORGE BOLES RUBBLE PILE SW 16- 32 -24 -4 - NOT CLEANED UP
WHAT ARE YOUR WISHES
18 BRUCE HASTIE REQUESTS ROAD NEAR LYDIA MARTENS BE ADDED TO
BRUSHING PROGRAM - 2 MILES SOUTH OF BOB PETERS -NORTH SOUTH AND
EAST CORNERS NW 24- 33 -26 -4