COUNCIL COMMITTEE MEETING MARCH 4th 1985
------------------------------------------
------------------------------------------
A committee meeting of the council of the M D of Kneehill 448
was held in the M.D. Office, Three Hills on Monday, March 4th,
1985, commencing at 9.00 A M
Those present were
J. Finlay Code, Otto Hoff (Reeve), Robert E Boake, Richard A
Maerz, Harold Mueller, Reginald G. Campbell, J. C. Jeffery
IlAdministrator
Councillor Hastie is still away on holidays.
The committee members went to the shop to see a presentation from
Vulcan Machinery on their new crawler They also reviewed the
grader shop and discussed how best to repair the shop. They
;;returned to the office at 11.15 A.M.
Mr Hoff reported that the City of Drumheller is requesting
permission to annex a portion of the M D of Starland The area
involved includes the new museum.
There was lengthy discussion about the grader shop in Three Hills
and it was agreed to recommend to council that a new grader shop
be constructed in Three Hills, cost about $120,000.00 and the old
shed for used for cold storage The new shed would have five
bays
The meeting then adjourned for dinner and the committee members
attended the open house regarding the land use bylaw until 1.45
P M
The need for a new shop in Acme was then discussed. It was
suggested the building should be big enough to house a
water truck and a fire truck, as well as the grader
The following specificiations were discussed-
Acme - 40 wide x 60 long - $60,000 00
- Doors 1 clear 14 foot x 18 feet wide
1 12 x 12 and
1 3 foot walk in door (steel with no window)
- Windows - approixmatley 2' x 4' thermo pane
- R -30 insulation on walls and R -40 on ceiling
- Doors should be R -30 as well
- Erected
- Cement 4 foot apron across front of shop
- Reinforced concrete for floor
- Heat and wiring
- 1 washroom plumbed for shower and complete with toilet
and sink
- Turn key price
- Floor drain required
- Hot water floor heat
- 3 banks of florescent lights with separate switches
- Straight Wall building - steel clad
- Foundation with piling
- inside wall gyproc
- Any levelling or fill required will be done by our crew
to specificiations
1
r�1
ti
a
i
C7
EW
Main Shop 50 x 120 $120,000 00
- Doors - Five 18' wide and 15' high R -30 Insulation
complete with four foot concrete pad
- Straight Wall metal clad building
- R -30 insulation walls and R -40 ceiling
- Hot Water floor heat - no floor drain required
- 1 Steel 3' insulated walk in door
- Florescent lighting between each door and on end walls -
- ?Sump - need one or not?
- Any fill or levelling required will be done by M D crew
to specifications
- Foundation with pilings
The remaining capital items approved to date are as follows
Air Conditioning for Office
Energy Technology Smokeeater
7 Electric Door Openers
Salt & Sand Storage Base
1 Trailer End Dump 18 to 20 yards
1 Kubota Tractor with loader & cab
1 Ford Tractor 350 Cat Diesel
1 9 Passenger Van 150 Model
1 Radio Tower at Shop 330'
1 Hydrualic Scraper
1 200 H P Crawler (Tender)
1 Air Compressor
1 180 H.P. Standard Grader
TOTAL TO DATE
It was suggested
until next year
$15,000 00
$ 2,400 00
$10,000 00
$10,000.00
$25,000 00
$15,000 00
$75,000.00
$16,000 00
$30,000 00
$35,000 00
$190,000.00
$ 6,000 00
$175,000 00
$784,400 00
the shop heat and ventilation would be left
The land buying policy for the M D was reviewed and there was
discussion about how the new assessment figures would be used to
calculate price to be paid for land. It was recommended that the
policy be changed to use one - quarter of 10% of the new assessment
The meeting adjourned at 5 05 P M
- - - -- - --- -- --- - - - - --
J. C.,Jeffe y un ipal Administrator