HomeMy WebLinkAbout1978-06-13 Council MinutesROAD TOUR JUNE 13th, 1978
A road
tour
was held June 13th 1978 commencing at 9 OO;A M The following
were
present
G
A Berdahl, C W Poole, A W Bauer, T A Ferguson, L G Litz R G
Campbell,
John Dorn and John Jeffery
a
The
following locations were investigated.
1
S of
14 15 and 16 in 32 -24 -4 regrade & regravel
3 miles
v"2
W of
4 & 9 in 32 -24 -4 (new grade) building and gravel
2 miles
3
S of
31- 32 -25 -4 Clean out ditches and backslope
2 mile
4
W of
32- 32 -25 -4 Clean out ditches and backslope , cut down hill
1 mile
5
W of
13, 24 25 & 36 in 31 -26 -4 grade with graders bring road in &
gravel
4 miles
6
Tony
Greke, Sunnyslope - requires fill on SE side of house - on
road allowance
7
S of
17, 18 in 31 -25 and South of 13, 14, 15 & 16 in 31-26 -
light coat surface
6 miles
i
8
W of
10- 31 -26 -4 Build road approximately 200 yards into house
i
j
9
W of
9- 31 -26 -4 See R B Brown - road required into house also
10
West
of 29 & 32 in 31 -26 -4 Rebuild and regravel thru slough
2 miles
11
Page
road - =house should be assessed as rented out
Page to give us 33' if approved
J C Jeffery to write Page regarding 33' after
Council approval
South of 31- 31 -26• -4
12
S of
23- 32 -27 -4 Same as #11
13
West
of 1, 12, 13 & 24 in 33 -27 -4 backslope and brush
4 miles
14
Sign
for cemetery at Herron - need paint - advised Norman Soder
June 15th, 1978
15
S of
13 33 -27 -4 backslope and brush
1 mile
16
S of
18 33 26 -4 backslope and brush
1 mile
17
W of
8- 33 -26 -4 backslope and brush
1 mile
18
S of
15- 33 -26 -4 Culvert to be fixed
,-19
W of
29- & 32 - 32 -25 -4 Rebuild and regravel
2 miles
20
W of
25- 33 -26 -4 Rangeland put pipe thru culvert
21
W of
13 & 24 in 34 -26 -4 REbuild & regrade
12 miles
22
NE 11- 34 -25 -4 Culvert in bad shape
23
Huxley south road from #21 to 805 resurface
15 miles
./24
W of
25 & 36 in 33 -25 -4 Rebuild & straighten - bridge required first
2 miles
,/25
S of
13, 14 & 15 in 33 -25 -4 andi3.South of 18 33 - -24 -4 rebuild & regrade
4 miles
26
W of
6 & 7 in 33 -24 -4 rebuild 2 mile with creek crossing or bridge
2 miles
27
Fix culvert north of George Adams
28
SE 27- 33 -24 -4 Fix corner 4 ways and small amount of work required just
north
of the corner
29
SW 11- 34 -24 -4 culvert required and fill in grade
30
W of
28 & 33 34 -24 -4 brushing required
31
S of
25- 34 -24 -4 rebuild and regravel
1 mile
j 32
Fix holes south of community center in Huxley
33
W of
33- 34 -23 -4 Bury brush
V'34
W of
17 & 20 in 34 -22 -4 rebuild & regravel
2 miles
35
S of
5 34 -23 -4 repair by railway tracks
36
NE 35- 33 -23 -4 Clean up corner, snow problem and damaging corner
37
NW 35-
33 -23 -4 Paul Stroschein - fix culvert and rip rap, etc
38
NE 34-
33 -23 -4 Repair ditches and build up road
./'-19
W of
13- 33 -23 -4 rebuild & regravel
1 mile
40
W of
12- 33 -23 -4 fix up road for Frere couple of loads of dirt required
over
culvert
w
J
`410
C
ROAD TOUR JUNE 13th, 1978
P 2
41 Haller N of 12- 33 -23 -4 Water problem to be fixed
42 S of 2- 33 -23- Vern Bogner - fill in road and new culvert r
43 R Haller W of 18- 33 -22 -4 clean out ditches both sides
X44 S of 13- 32 -23 -4 rebuild and regravel
45 Fix up Vanover culvert S of 18- 32 -22 -4
,,-46 W of 5- 32 -22 -4 cut hill and backslope - signs required
47 King - Y corner take out Y and build up NW 35- 31 -22 -4 roe
of approach
48 Frolek corner - take out Y as above NE 22- 31 -22 -4
49 CWThomas corner take out Y as above SW 22- 31 -22 -4
-50 W of 17, 20 29 & 32 in 31 -22 -4 rebuild and regravel
51 Hourihan South - fix up road and culvert
West of 30- 31 -23 -4
The tour was completed about 7.00 P M
Munici Administr<
r