Loading...
HomeMy WebLinkAbout1978-06-13 Council MinutesROAD TOUR JUNE 13th, 1978 A road tour was held June 13th 1978 commencing at 9 OO;A M The following were present G A Berdahl, C W Poole, A W Bauer, T A Ferguson, L G Litz R G Campbell, John Dorn and John Jeffery a The following locations were investigated. 1 S of 14 15 and 16 in 32 -24 -4 regrade & regravel 3 miles v"2 W of 4 & 9 in 32 -24 -4 (new grade) building and gravel 2 miles 3 S of 31- 32 -25 -4 Clean out ditches and backslope 2 mile 4 W of 32- 32 -25 -4 Clean out ditches and backslope , cut down hill 1 mile 5 W of 13, 24 25 & 36 in 31 -26 -4 grade with graders bring road in & gravel 4 miles 6 Tony Greke, Sunnyslope - requires fill on SE side of house - on road allowance 7 S of 17, 18 in 31 -25 and South of 13, 14, 15 & 16 in 31-26 - light coat surface 6 miles i 8 W of 10- 31 -26 -4 Build road approximately 200 yards into house i j 9 W of 9- 31 -26 -4 See R B Brown - road required into house also 10 West of 29 & 32 in 31 -26 -4 Rebuild and regravel thru slough 2 miles 11 Page road - =house should be assessed as rented out Page to give us 33' if approved J C Jeffery to write Page regarding 33' after Council approval South of 31- 31 -26• -4 12 S of 23- 32 -27 -4 Same as #11 13 West of 1, 12, 13 & 24 in 33 -27 -4 backslope and brush 4 miles 14 Sign for cemetery at Herron - need paint - advised Norman Soder June 15th, 1978 15 S of 13 33 -27 -4 backslope and brush 1 mile 16 S of 18 33 26 -4 backslope and brush 1 mile 17 W of 8- 33 -26 -4 backslope and brush 1 mile 18 S of 15- 33 -26 -4 Culvert to be fixed ,-19 W of 29- & 32 - 32 -25 -4 Rebuild and regravel 2 miles 20 W of 25- 33 -26 -4 Rangeland put pipe thru culvert 21 W of 13 & 24 in 34 -26 -4 REbuild & regrade 12 miles 22 NE 11- 34 -25 -4 Culvert in bad shape 23 Huxley south road from #21 to 805 resurface 15 miles ./24 W of 25 & 36 in 33 -25 -4 Rebuild & straighten - bridge required first 2 miles ,/25 S of 13, 14 & 15 in 33 -25 -4 andi3.South of 18 33 - -24 -4 rebuild & regrade 4 miles 26 W of 6 & 7 in 33 -24 -4 rebuild 2 mile with creek crossing or bridge 2 miles 27 Fix culvert north of George Adams 28 SE 27- 33 -24 -4 Fix corner 4 ways and small amount of work required just north of the corner 29 SW 11- 34 -24 -4 culvert required and fill in grade 30 W of 28 & 33 34 -24 -4 brushing required 31 S of 25- 34 -24 -4 rebuild and regravel 1 mile j 32 Fix holes south of community center in Huxley 33 W of 33- 34 -23 -4 Bury brush V'34 W of 17 & 20 in 34 -22 -4 rebuild & regravel 2 miles 35 S of 5 34 -23 -4 repair by railway tracks 36 NE 35- 33 -23 -4 Clean up corner, snow problem and damaging corner 37 NW 35- 33 -23 -4 Paul Stroschein - fix culvert and rip rap, etc 38 NE 34- 33 -23 -4 Repair ditches and build up road ./'-19 W of 13- 33 -23 -4 rebuild & regravel 1 mile 40 W of 12- 33 -23 -4 fix up road for Frere couple of loads of dirt required over culvert w J `410 C ROAD TOUR JUNE 13th, 1978 P 2 41 Haller N of 12- 33 -23 -4 Water problem to be fixed 42 S of 2- 33 -23- Vern Bogner - fill in road and new culvert r 43 R Haller W of 18- 33 -22 -4 clean out ditches both sides X44 S of 13- 32 -23 -4 rebuild and regravel 45 Fix up Vanover culvert S of 18- 32 -22 -4 ,,-46 W of 5- 32 -22 -4 cut hill and backslope - signs required 47 King - Y corner take out Y and build up NW 35- 31 -22 -4 roe of approach 48 Frolek corner - take out Y as above NE 22- 31 -22 -4 49 CWThomas corner take out Y as above SW 22- 31 -22 -4 -50 W of 17, 20 29 & 32 in 31 -22 -4 rebuild and regravel 51 Hourihan South - fix up road and culvert West of 30- 31 -23 -4 The tour was completed about 7.00 P M Munici Administr< r