HomeMy WebLinkAbout1977-04-04 Council MinutesROAD TOUR M D OF KPIEEHILL #48 April 4th, 1977
-_---------------------------------------------- - - - - --
Those present for the road tour were
R W Brown, R G Campbell, T A Ferguson, G A Berdahl; A W Bauer,
L. G. Litz, T C Paquet e, John Dorn and J C Jeffery
1 Ron Toews Dam -- SW 6- 32 -24 -4 John Dorn to bring levels to next
meeting Dam is 100 feet from Center line of road Culvert
is 6/10' lower than west side and 1' lower than east side of dam
2 Rebuild From Jim Tanish North - 1 mile West of 32- 31 -25 -4
3 Sunnyslope Road - Rebuild 2� miles South of 17 & 18 31 -25 -4 & Pt S13-31-
4 Tony Greke in Sunnyslope - Gravel required 26 -4
5 John Molendyk South rebuild 2 miles West of 32 & 29 in 31 -26 -4
6 West of 28 & 33 in 32 -26 -4 - Chevron Standard has drilled
seismic holes in road bed Reported to G Park 6/4/77
7 SW 21- 32 -26 -4 Want hill cut down into Ron Toews gravel pit
8 Wimborne Church Write United Church of Canada and see if we can
purchase etc
9 Resurface 4 miles Wimborne Plant Road South of 2 West of 1 & 12 and S
of 14 in 34 -26 -4
10 Bruce Hastie Road - Bridge curves and hill problems West of 36- 33 -25 - -4
11 Drainage Ditch Siltala °s South of 13- 33 --25 -4
12 Clearvalley Farms north - Clean ditches and build up valleys
West of 10 & 3 in 33 -24 -4
13 Haller Road - rebuild lk miles West of 7- 33 -23 -4
j� _-14 South of 4- 33 -23 -4 Clean Ditches north side of road
� _-15 West of 32-- 34 -22 -4 Dirt Work required
7 X6 Bury Brush - West of 36- 34 -22 -4 and West of 35- 34 -23 -4
I-IJ Ditch to be cleaned out South of 5- 34 -23 -4
18 Ellehill Road West of 30 & 19 in 34 -24 -4 Clean out ditch and bury
brush
19 West of 34 & 27 in 33 --24 -4 Rebuild 2 miles
111 20 Gary Adam north - Culvert required and ditching required further
south - West of 25- 33 -24 -4
�j 21 Walter Anderson south - Patch work required and move culverts
West of 30 & 31 in 33 -23 4
22 Rebuild 1 mile Hudson Bay Plant Road West of 31- 32 -24 -4
ii 23 Ron Gorr - Clean out culverts west of 2- 33 -25 -4
24 Valley to be filled - north of 19- 32 -25 -4
25 Culverts required from new job last year South of 13- 32 -25 -4
and South of 18- 32 -24 -4
26 Rebuild 2 miles South of 15 & 16 in 32 -24 -4