ROAD TOUR CONTINUED APRIL 7th,1976
P 5
The road tour continued on April 7th., 1976 commencing at 9 °00 A M with all councillors
present, except Councillor T A Ferguson
T C Paquette, John Dorn and J C Jeffery were also present
1 Clearvalley Farms North - West of 3-33 -24 -4 - Water across road - ditch to be
cleaned out or road filled Fill also required approximately 3; mile north
2. Carlson Road W of 15- 33 -25 -4 - mounds of dirt from power poles need
distribution further south to make larger approach for Carlson - also 1
or two mounds further north
3 Carlson West • West of 9- 33 -25 -4 - backsloping required on south side of road
4 Weisenburger West -- rebuild 2 mile of road north of 7- 33 -25 -4
5 Becker West - Road requires straightening or compensate him for some - West
of 25- 33 -26 -4
6. Russel Smith Road - south of 5 and 6 in 34 -25 -4 Rebuild 2 miles
7 Howard Road - Finish job started last season - south of 30- 34 -25 -4
8. K Braham South -- Road needs to be built up,3 or 4 power poles to be moved
West of 24- 34 -26 -4
9 West of 22 and 15 34 -26 - -4 = needs grading and gravelling re oil wells
10 West of 24- 33 -27 -4 - trees required to be sprayed in ditch
11 Looked at Fred Art proposed bridge west of 26- 32 -27 -4
12 Rebuild 4 miles - west of 25 and 36 in 33 -25 -4 and west of 1 and 12
in 34 -25 -4
13 Pof... Road - clean out ditch - east of 3- 34 -24 -4-
14 Leischner Road - West of 31- 33 -23 - -4 requires fill
15 John Smyth Crossing - south of 11- 33 -23 -4
I
110��
C7
[�E
COUNCIL MEETING APRIL 7th.1976
The Council of the Municipal District
Office, Three Hills, commencing at 2
following road tour
Those present were
Gilbert Berdahl
Div
1
C W Poole
Div
2
Ralph W Brown
Div.
3 (Reeve)
Art W. Bauer
Div
4
Leonard Litz
Div
6
R G Campbell
Div
7
of Kneehill #48 met at the Municipal
00 P M , on Wednesday, April 7th,1976
G G King Secretary - Treasurer was present and recorded the minutes
Ted Paquette, Public Works Superintendent
and John C Jeffery, Assistant Secretary- Treasurer were also present
Mr Joe Dobler, Gravel Foreman met with Council and outlined the results
of gravel testing done with Bertram Drilling.
1 NE 23- 28 -22 -4 - Earl Fraser - along the ridge - 8 to 10 feet gravel
and 10 feet sand - very little cover
2. Same land as above , but further north Sand only
3 SW 24- 28 -22 -4 Marathon Realty - 6 feet gravel and 34 feet sand and sandstone
4 NW 10- 29 -22 -4 - Ross Fraser - - on slope of hill close to Hesketh Pit
40 feet clay and then 20 feet gravel
From the above it would appear that gravel would best be obtained from Location
No 1 and from across the road to the east in NW 24- 28 -22 -4
(Andrew Groenveld - lessee) - Marathon Realty Owner
Mr Litz moved that the above report be accepted and the matter of leases for
the NE 23 and NW 24- 28 -22 -4 be followed up, and further testing done with a
backhoe.
Carried
Mr Campbell and Mr Dobler reported on testing for gravel east of Trochu
by Bertram Drilling No suitable gravel had been located. Mr. Campbell stated
he has been advised there is good gravel in the river north east of Trochu and
perhaps more near the Elvin Location
Inspection should be made in some manner and then consideration given to
a road access Mr. Bauer moved that the Road Committee follow up on this matter
Carried
Council was advised that Andex Oil had inquired about access to the well site in
LSD 6- 2630 -24 -4 - Loosmore The proposed outlet to the west is costly because
of the coulee and also cuts the land up rather badly. Mr. Poole moved that
Council approve access from the south along the east side of the coulee and
then following the route as per diagram of Andex Oil
Carried
Alberta Environment had contacted our office regarding proposed use of
NW 33- 29 -25 -4 for a sanitary land fill Mr Brown discussed this privately
with Mrs Ruth Bates, who advised that Mr and Mrs Ken Balderson are negotiating
a lease of the said land for.1976 Mr Berdahl moved that Council approve
of Alberta Envaronment grant�agfarm lease to Mr and Mrs Balderson for the
7W 33- 29 -25 -4 for the year 1976, on condition that the Baldersons agree
that the M D may have an access road and an area for a sanitary land
fill if required later in the year., estimated total acres would be 12 acres
as outlined in red on the sketch by Mr Charles Lau of the Drumheller Health
Unit If the M D enters upon the said portion of the land, it will be
obligated to pay $350 00 to the Baldersons for their out of pocket expenses
Carried 2
ti
H
COUNCIL MEETING - - APRIL 7th,1976
P.2
Mr Poole advised that he has been requested to get a number of
trees trimmed in Swalwell Some should be removed Estimated
price obtained through information from the Town of Three Hills
was $12 00 per tree for trimming or $22.00 per tree to remove Branches
etc, are ground up and the waste hauled away There may be other
alternate ways of getting it done Mr Campbell moved that
Council authorize work done on the Swalwell trees with Mr Poole to
be in charge Carried
Mr Dobler stated that he can do any urgent gravel /ongrequest
but wishes to avoid any unnecessary moving.
It was suggested that the mile of road from W Gibson East be
done fairly soon
Mr. Dobler then left the meeting.
Mr G King advised Council that he had telephoned Mr Earl
Danchuk, Secondary Road Engineer regarding the paving
program for this year Mr Danchuk had advised that the allottment
had been cut back and it appeared.salikely that no paving would
be approved for this Municipal District this year
Mr Danchuk had also stated that he believed that the Three Hills
West Road should have first consideration Council discussed this
and Mr G King made it clear that the information is not final
but a definite answer should be received in approximately two weeks
Mr Bauer moved that Alberta Transportation be asked to make
traffic counts on the Three Hills West Road and on the Pope Lease
Road
Car ried
Mr Brown moved that a letter be written to Dr Hornar, "lberta
Transportation Minister asking why the M D of Kneehill did not
receive any additional road grant last fall similar to additional
grants given to other municipalities
Carried
Mr. G. King advised that there is no registered road along the
south side of Section 33- 28- -20 --4 - Stockton - but it has been
used as a public road for many years Mr Poole moved that Mr
G Berdahl and Mr G. King negotiate with the land owners to have this
made a public road
Carried
Council then discussed where the main crew should start work
Mr King advised Council that he had telehoned the Bridge Branch
and it is unlikely that any government culverts or extensions will be
delivered here before June lst
Council considered the previous request of Mr Ferguson that the first
work be done on the Correction Line south east of Three HIlls, but
decided it might b.: best to delay this somewhat until the culvert
extension is here
Mr Litz moved that the first jobs for the main crew be Items 3 and 5
from the Road Tour Report of April 5th, with the foremen to decide which to
do first -, and that each have a 26 foot top, and that one packer be used
Locations are. W of 28 and 33 in 31 -24 -4 and West of 20 and 17 in 31 -24 -4
Carried
Mr Berdahl asked to be recorded as opposed
. 3
P
C
.0
N
COUNCIL MEETING - APRIL 7th,1976
P 3
Mr. Bauer moved that the Small Crew be authorized to start
work south of Hesketh at W 35 and West of 14 in 28 -22 -4
Carried
Mr. C. Berthot of Gulf Oil met with Council and asked for road
improvements between Sections 21 and 22 in 29 -24 -4 Mr Poole
moved that the M D agree to maintain and improve the road with ✓
a motor grader and to supply approximately 200 cubic
yards of crushed gravel from the Megli Pit, with Gulf Oil to
haul the gravel at its own expense
Carried
Mr Berthot thanked Council and then left the meeting
Mr Paquette advised that he had contacted Star Blacktop Ltd. about
coming to Three Hills to prepare patch material for surfacing
They quoted $4000.00 to move in plus 40� per gallon of oil used
The M D would supply the oil and the gravel Based on 4000 cubic
yards of work the approximate total price would be $23 62 per cubic
yard. Prices per cubic yard would be higher for smaller quantities
Mr Paquette also advised that Border Paving at Red Deer would supply the mix
material at approximately $15 75 per ton Hauling would be extra, so
the total price might be slightly higher, but the material would be
obtained fresh when needed Mr. Litz moved that the patch material
be hauled from Red Deer as required
Carried
Mr Bauer moved that this meeting do now adjourn
Carried
Time of Adjournment 4 40 P M