Loading...
HomeMy WebLinkAbout1976-04-05 Council Minutes11 E M MUNICIPAL DISTRICT OF KNEEHILL #48 ROAD TOUR APRIL 5th; 1976 A road tour was held on Monday, April 5th, 1976 and following persons were present. G. A. Berdahl Div 1 C W Poole Div 2 Ralph W Brown Div 3 (Reeve) Art W Bauer Div 4 T. A Ferguson Div. 5 L. G. Litz Div 6 R G Campbell Div 7 Ted Paqu ,3tte, John Dorn, Norman Soder and J C Jeffery were also in attendance The following jobs as listed were considered the priority jobs for each Councillor in their division. 1 Len Brosseau Hill - West of 13- 31 -24 -4 - needs widening for better vision 2 Intersection on West side of 11- 31 -24 -4 - west of Three Hills Rural School - advised to put up stop signs at a later date 3 The road west of 28 and 33 in 31 -24 -4 - needs grading and gravel for approximately 2 miles. It was noted that Mobil Oil has three wells, Hudson Bay has two wells and Andex Oil has three wells on this two mile stretch of road 4 Mount Olive Church - north - corner needs cleaned up. West of 32- 31 -24 -4 5. West of 20 and 17 - 31 -24 -4 - needs grading and gravel for two miles - it was noted that Andex have two wells and Mobil Oil have three wells on this road NOTE- Regarding Item 3 and 5 - Both Andex Oil and Mobil Oil had asked that these roads be improved this year if possible 6. Sunnyslope Road East - South of 17 and 18 in 31 -25 -4 - and Pt of South of 13 - 31 -26 -4 - approximately 2;� miles - It was also noted that the Sunnyslope drainage project was also looked at 7. Sam Megli Road Diversion - approximately 3� mile on West of 31 and 30 in 30 -25 -4 8 Council stopped at the Tom Baerg's proposed gravel location on SE 24- 30 -26 -4 It was generally agreed that there was not much gravel at this location, but would bring it up at next Council meeting 9 Linden Overpass Job was looked at regarding grass seed 10 South of 16 and 15 in 30 -25 -4 - two miles regrade and regravel 11 Acme Tomm new well site - on West of 35- 29 -26 -4 - was noted that 13� miles will have to be graded, and gravelled to this location. 12 The Linke Road - West of 2 and 11 in 30 -26 -4 - approximately 3!k mile needs improvement 13 Acme South Ea7t Road -- regrade and regravel 3 miles being south of 17, 16 and 15 in 29 -25 -4 14 _T_t was noted that a new deck is required for the bridge on NW 33- 30 -26 -4 15. J. W. Gordon West - through Sections 10, 11 and 12, in 29 -24 -4 Regrade and re- gravel approximately 3 miles ... .... ....2 i i 1 1 L� C ROAD TOUR CONTINUED - APRIL 5th,1976 P 2 16 Ted Vanderberg Road - West of 26- and 35 in 29 -24 -4 - regrade and regravel approximately 2 miles 17 Earl Poffenroth Road - Regrade and regravel four miles from south of 1, 2 , 3 and 4.. in 30 -24 -4 18. Swalwell West - - regrade and regravel 1� miles south of 16 and 17 in 30 -24 -4. 19. Ellis Reimer Road - West of 30- and 31 in 30 -24 -4 Regrade and regravel 2 miles 20 Harold Howe - Road - South of 3, 4., 6 and 6 in 31 -24 -4 Regrade and regravel 4 miles 21 Twining South Road - south of 1 and 2 in 31 -24 -4 and south of 6 in 31 -23 -4 Regrade and regravel three miles 22 Les Crawford Coulee - North of 20 and 19 in 30 -23 -4 - new grade approximately '1 mile 23 Gordon Park West - south of 18 in 32 -24 -4 and south of 13 in 32 -25 -4 two miles - regrade and regravel 24 The Torrington Gravel Pit was looked at briefly along with the proposed new Schmautz Pit 24(a) Maurice Frere North - West of 31 - -32 -24 -4 - rebuild one mile 25 Albrecht Road - West of 7- 33 -25 -4 -- needs new bridge and straightened re oil company use 26 It was noted that a culvert needs lowered on the road going north one mile east of Charles Cunningham This was reported by T A Ferguson. The road tour ended at approximately 5 15 P M ---------------- J C Jeffery