HomeMy WebLinkAbout1975-04-17 Council MinutesROAD TOUR
APRIL 17th, 1975
P. 1
II The road tour was completed Monday, April 17th, commencing
at 9 00 A.M.
Those present were- R W Brown, C W Poole, A.W.Bauer, T A
Ferguson, L Litz, and R G Campbell
A.H.Church was present for a portion of the
tour Mr T C Paquette and Mr John Jeffery
and Mr John Dorn were also present
1. Rebuild 2 miles of road from L Vasselin Corner west two miles
South of Sections 3 and 4 in 31-23-4
2. Snell Approach - Change culvert from driveway across the road
so water runs from west side to east side of
road rather than all staying on west side of
road.
East /NE 21-30-23-4
3 Rebuild 3 miles from Carbon South Cemetery going east -
Mile 4, 5 and 6 -
South of Sections 29, 28 and 27 in 28-22-4
The tour concluded at approximately 2 30 P.M
--------------------------
John Jeffery
4 Carbon Bridges to be finished
5 Beynon Hill - Rebuild Road (Survey now being taken)
in Section 30-27-20-4
Designs required soon if any change to be made,
as one party will move fence if changes to be
made, otherwise will not change her fence line.
She wishes to know fairly soon
Suggested write Alberta Wheat Pool and United Grain Growers
as to their plans for the elevators at Beynon Will they
remain open or not.
6 W Reinhardt North - Straighten out road - West of 26-28-22-4
7 Cirankewicz - (Bruce Hastie farming land) Need approach
into land from East of E27-33-22-4
Present approach into property is very dangerous
8 North Huxley Road - West of Elmer Meding - (Must be fixed)
Spring -Old Seimic Hole - Check who is
responsible for fixing same
N/NE 23-34-24-4
9. G.Haller South Fill dip, cutu hill (steep dip)
West of 13-33-23-4
The tour concluded at approximately 2 30 P.M
--------------------------
John Jeffery