HomeMy WebLinkAbout1974-04-17 Council Minutes11
N
Im
11
FORM T1 149-P SPECIAL
ROAD TOUR REPORT P.3
APRIL 17, 1974
44 -
Tro
hu West - consider rebuilding south of Sections 13, 14,
15 &
16-33-24-4•
45 -
SEcorner-1-33-25-4
- Albright - Consider creek diversion
and
road diversion to allow traffic to get north
46 -
W 5-&
8-33-24-4 - improvements requested by Hudson Bay Gas
and
Oil
47 -
Adams North - W-27-33-24-4 - about 3/4 mile - very bad
for
snow, etc
48 -
W-30
& 31-34-24-4 - Robert Browns - should brush and
bac
slope and perhaps get A. Silver to move his bins
49 -
North
of J Hogg in 5E-4-35-24-4 - brush trees round the
bend.
50 -
W-23-34-22-4
- North of Knudsen's - trim up and backslope,etc.
51 -
North
side of Trochu west of railway - see M Williams
abo
r planting trees for snow protection.
52 -
Finj Hall east to Louis Sich - perhaps start from the east
and do 2 3/4 miles or more
53 - NE c
out
the
54 -
:orner 34-31-22-4 - north of N King - Consider taking
the rounded corner and doing work required to improve
hill and vision
E/N�-27-31-22-4 - J. Malaka - improve vision for his
dri eway approach
55 - Thre Hills east - Bert Leuf east 4 miles - second coat
of turfacing
56 - Gho t Pine south - minor work to finish W-28 & 33-31-22-40
McL an cattle pass should be o.k. but minor work needed
at he ends. Rebuild next 2 miles going south being
W-1 & 21-31-22-4 - S. Milan
57 - Conider a detour round the creek in NE -20-31-22-4 to
oDe road 1 mile west - McLean's
58 - Eas of 3-31-22-4 - Ranostay - Carney - Water was running
ove the road - it likely needs a culvert
59 - Fro NE -7-31-21-4 south 4 miles - W. Peterson south -
sec nd coat of surfacing.
60 - N -3i-30-21-4 - John Watt - culvert and minor work needed,
also check regarding wash-out at end of culvert in coulee
west of Watt's
61 - Rivr hill in 4-31-21-4 - P Rock - general condition very
goo4 but rocks needed at the end of 1 culvert.
62 -
W/ -8-30-21-4 - H Stanger north - Gordon Bell requests
better backsloping on east side of the road, also requests
field approach between NE and NW of 8 to serve both
quarters
i
4
r
r
0 M 49 SP CIAL
ROAD TOUR REPORT
APRIL 17, 1974 P 4
63 - E/S -17-30-21-4 - Moar south - second coat s -.lacing
for at least mile and perhaps to the top of the hill
64 - Beteen Albert Stanger and Gordon Bell - W/NW-4-30-21-4 -
nee s a culvert.
65 - Orkey hill - some concern about one narrow corner especially
bec use tourists tend to pack in that area
66 - Sou h of Lions Club Camp on river flat - wash-out needs
rep firing.
67 - River flat from foot of Orkney Hill south-east - consider
for light -coat surfacing.
68 - Fro NE -20-28-20-4 at No 9 south to Taylor Siding -
sec nd coat surfacing.
69 - Cla k - culvert near previous wash-out requires 2 loads
roc .7 for the end.
70 - Bey on hill in Section 30-27-20-4 - too slippery in winter -
roa might be relocated but further study would be needed
for that
71 -
72 -
S-27, 28 & 29 -28-22-.', - Ziegler - MacMann - consider
reb ilding these 3 miles as a continuation of the 3 done
las year from the cemetery east Trim around power
pol s on last year's job.
Car on south to No 9 - Consider second coat surfacing.