HomeMy WebLinkAbout1974-04-15 Council Minutes'Js1
0
FORM TI 749 �' SPE CIAO
ROAD TOUR REPORT P.1
1974 PROJECTS - APRIL 15, 1974
1 - Gustafson road - 4 miles - Regrade - already surveyed (same
as 48, 1972 list)
2 - NW -4 &I Section -9-32-24-4 - Seth Meier North - regrade lj miles.
3
- Three 4ills
West - resurface 4 to 5 miles
4
- Draina
e problem at Cecil Godlinton - south -4-31-26-4
5
- South Df
A R.Davis - government culvert required.
6
- South boundary
road Division 3 - Regrade 3 miles
7
- Acme c
rner North 3/10 miles, Reimer coulee and overpass need
paving
- South
6-30-25-4 - Regrade 1 mile
9
- West -30-30-26-4
- Linden elevator road needs road work for
j mile.
10
- Ray R
tzlaff road - Rebuild 1 mile
11
- 2 mile
north of Linden Home on Correction Line. Brushing
needed1badly
- NE -32-30-25-4
12
- Morris
Charlton North - wants straight through road through
slough
- take out bend in road on West -29 & 32-31-26-4
13
- Vern K
inti road - Rebuild 3/4 miles.
14
- Dennis
Temple South - Rebuild mile.
15
- Milton
Rempfer road - Rebuild mile
16
- J.0 Smith
North - needs second coat of surfacing - 3 miles.
17
- Fergus
n road south of 26,27 & 2$-34-26-4 - Rebuild 3 miles.
18
- Keith 3raham
- Rebuild and clean up 3/4 miles - WJ-24-34-26-4•
19
- Bob Carlson
road - 2 miles Rebuild W-15 & 22-33-25-4
(same
s 33, 1973)
20 -
Leonard
Sanderman south going east two miles - Rebuild and
gravel
- S-13-32-25-4 and S-18-32-24-4
(See Page 2)
I
I
C7
9
C
FORM Ti 149-P SPECIAL
NEW OLD
NO. N0
21 3F- _
0
ROAD TOUR REPORT
UNCOMPLETED PROJECTS 197
ke Klassen North -- Grade 2 miles
P.2
22
48
- Lynn Gustafson South - W-1, 12 & 13-32-24-4 - Regrade 3 miles
23
50
- Cdrrection line South of 1 and 2-31-24-4
UNCOMPLETED PROJECTS 1973
24
7
- Acme East - About 7 miles to be rebuilt but special considera-
tiaon to be given to A G T. Ines.
25
11
- Earl Poffenroth E/W - S-1 2 & 3-30-24-4 - Clean ditches
acid rebuild parts.
26
12
- Svalwell West 3 miles - general clean up of ditches, etc
27
14
- N-32-30-25-4 - Correction Line north Linden Home
v si on .
28
15
- Wdst of 3 & 10-31.:-25-4 - Ratzlaff rebuild two miles
29
22
- R'Ichardson North - W-15 & 22-31-24-4 - Build up culvert
and consider gravel
30
29
- K Anderson - W-12 & 1-34-24-4 - Rebuild to barnyard
a iproach and repair south
31
32
- Pcjffenroth South _Being West 2-34-21!,,-4 - Repair and clean
d.tch.
32 33 - AIgus Park - Carlson - 71-15 & 22-33-25-4 - ?.ebuild
33 35 - A�t Knievel Road - From Trochu ball pars East and North,
total 24 miles to rebu2id plus road over t:^ack to Norman Koch.
34 36 - Tony Knievel East and youth -33-23-4 - Road Committee to
inspect this summer.
35 37 - G gyi North - From SW-�4-34-23-4 north - backslope and
tr1im brush for four ml -..les.
36 38 - Corner at SW -25-34-23 4 - Ottosen - Vision should be improved
37 41 - Njrtheast Bob Paintervs road through Sec 3-34-22-4 - Road
Cmmittee to inspect this summer.
38 42 - Art Meding East - Consider drainage in 5E-25-33-23-4
39 43 - Art Meding West corner at SW -25-33-23-4 - Build up the corner
40 45 - Finn Hall Road East - From SE -2$-32-23-4 East - Rebuild as
far as possible
41 52 - M rte Anderson Road North - W-20 & 29 - etc in 30-22-4 -
R build approximately 22 miles
42 5$ -Gas Plant and Canyon Road - S -28 -?8-21-4 - Fix slough and
improve drainage.
43 62 - Beynon Hill in 29 & 30-27-20-4 - Needs widening