HomeMy WebLinkAbout1966-05-30 Council Minutes%W'
11
M
COUNCIL MEETING
May 30, 1966 Page 1
A special meeting of the Council of the Municipal
District of Kneehill No 48 was held at the Municipal
office, Three Hills on Monday, May 30th, 1966, commencing
at 2 P,M
Those Present
were
equipment In stock. He stated that the
Councillors
A H Church
Div
1
ollowed
C W Poole
Div.
2
R.W. Brown
Div
3 (Reeve)
h Council
Dunc Peters
Div
4
equipment in connection with the paving program
Ralph Loosmore
Div.
5
!quired
Lbber tired packer can be used for packing gravel
S. C. Schmelke
Div
6
i the best type to buy
C C. Campbell
Div
7
Mr Peters moved that Council waive notice of this
meeting and proceed to deal with any business which may
be brought before it. Carried unan.
SPECIAL
MEETING
WAIVE
V NOTICE
Mr Ral h Brown gave a verbal report regarding R BROWN
packing equi ment on behalf of the committee of Mr Church, REPORT OF
Mr Peters, 4r Paquette, G G King and himself who had PACKING EQUIP
been to Calgiry to inspect same This was tabled until
later in the meeting i
Mr. Bo
Council and
following a
Vibrat
Wedgef
Pneuma
They h
used packin
rental purc
10 days wit
discussion
Mr. Mc
Mr L1
then met wi
Mr. Da
respect to
1. For
packer is r
2 A r
and also fo
propelled i
3 A s
facing.
4 A v
cannot be u
and he woul
The f�
in Calgary
1 No
$2500 or
2 Vi'
3 S e;
month.
4 Ne-
packer wit
and sprink
i.fications
would have
in two to
FORM 10 -P SPECIAL
LTD.
McDonald of Street Robbins Morrow met with STREET R M
discussed hyster equipment, and gave the RE HYSTER
proximate prices EQUIP
ry machine $8,250.00 V'
of Dual 7,000 00
is 9 wheel 23,000 00
d no steel wheel rollers and they had no
equipment In stock. He stated that the
ase could be arranged Shipping time approx
delivery two to three weeks. General
ollowed
onald then left the meeting
L DAVIES
yd Davies and Mr Rainer Keglowitsch, Engineers,
R.KEGLOWITSCI
h Council
-ies gave the following as his opinions in
equipment in connection with the paving program
the dirt grading and general use, a sheepsfoot
!quired
Lbber tired packer can be used for packing gravel
sandy soil, and he suggested that a self -
i the best type to buy
.eel roller can be used only for the top sur-
.brator is very good for compacting gravel but
,ed for the final surface so has limited use
I not recommend purchase of this type
PIONEER
- lowing equipment handled by Pioneer Machinery
MACHINERY
ras then discussed
EQUIP,
112 Sheepsfoot packer with two 4811 drums -
°ental of $225.00 per month
^ator - $3200 00 or $375 00 per month rental
nan Mixer - $9500 00 or rental of $1500 per
j
self -rl... r :..lied Ferguson, pneumatic 11 wheel
Oliver 770 - 6 cylinder motor, 80 gal tank
er with 12 ply tires and certain other spec -
as noted - approx. price $10,092. This unit
to be ordered specially, and could be delivered
hree weeks
See Page 2
IN
C
COUNCIL MEETING
May 30/66 Page 2
Mr. Peters moved that the sheepsfoot
packer be ordered
PACKER
from Pioneer
Aachinery on the rental
purchase deal unless
PIONEER
satisfactory
one can be located
in Edmonton soon
MACHINERY
amore
(his is Item
#1 referred to earlier)
Motion carried
The Rosco
9 wheel rubber tired,
self propelled ROSCO PACKER
acker which
Costello Equipment now has
for sale in
COSTELLO
P
Calgary was then discussed in considerable detail The
price of this unit with 12 ply tires and other spec-
ifications aq listed by the Company in its letter, was
$9,000.00 f.d b Three Hills
Mr Chu ch moved that a committee of Mr Dunc Peters, COMM
Cliff Poole, Stan Schmelke, Ted Paquette and G G. King EDMONTON
go to Edmont n tomorrow to inspect packing equipment and
that the committee have authority to order the Rosco
packer which is now in Calgary or to buy one in Edmonton
which may be preferred by the Committee on condition
that there b guaranteed quick delivery Carried unan
It was agreed that a committee of Mr. Ralph Brown, OPENING AT
Cliff Poole, C.C. Campbell, G. G. King AND Mr. A.H TABER
Church,if available, represent this District at the
opening of the new Municipal Administration Building
in Taber thi coming Wednesday.
Mr. Mel
Luepke of Industriml Road Equipment, met
M LUEPKE
with Council
and discussed the Galion rubber tired packer
GALION
at a price o
$10,459. with 10 ply tires Extra for 12
PACKER
ply would be
approximately $200 00 He stated he thought
delivery cou
d be made in approximately 3 weeks but
would have t
phone the factory and send word as to the
exact delive
y dates Mr. Luepke was thanked and then
left the mee
ing
Mr Llo
d Davies and Mr Rainer Keglowitsch gave the
TIME
following po
sible time schedule in regard to the
SCHEDULE
Torrington n
rth job
PAVING
1 Sub-
rade - do the southerly 2 miles between June
lst and 15th
the next two miles from June 15th - 30th
and the northerly
two miles by July 15th
2 699 layer
of 194 crushed gravel - do the south two
miles between
July lst and 10.th, the next two miles by
the 19th an
completed by the 30th
3 111 thickness
of 3/411 crush gravel - start Aug.
lst from thE
north and finish by Aug 9th.
4 Colc
Mix surface treatment - start about Aug
3rd from thE
north.
It was
agreed that our road crew should do any
LINDEN
stripping n
cessary at the Municipal pit, and that
CONTRACTORS
Linden Cont
actors start crushing on the 141 size not
later than tune
15th
Mr Bu
Hope, Bridge Inspector, met with Council
BUD HOPE
and discuss
d the following briefly
REPORT
1 Exa
4- 31 -26 -4 h.
Koch at the
2 He
Bridge at t
trimming is
two copies
FORM 19 -P SPECIAL
SUPPLIES LTD,
t location for the government culvert S-
d been discussed with Ralph Brown and Alan
site and agreed upon
tnd Alan Koch had inspected the site for the
1e foot of the Orkney hill, and some minor
needed on the headslopes He will send out
>f the design data soon.
See Page 3
4L
COUNCIL MEETING
May 30/66
Page 3
3 He and Alan Koch had inspected the place on the
Orkney flat where Council had asked them to build a
small bridge using salvage material It was agreed
that the gra e be raised approximately 34 at that
location.
4 Location west of 7- 31 -23 -4 will be inspected
today
5. He had not ccome to a definite decision re-
garding supp ying T, culvert for the Rowbottom coulee
S/SW- 29 -29 -2 -4 he coulee is about $01 deep` and
the culvert would have to be placed an a skew so would
need to be q ite long and of heavy material. It was
arranged tha Mr AlAn>. Church meet him there later
today fora urther discussion of this location.
Council was advised that the men repairing the
stucco and doing the painting on the outside walls at
the Three Hills Shop had reported that the eavestrough
was in very poor condition Mr Church moved that Mr
H J Hanson have authority to get new eavestroughing
put on the Threo Hills Shop Carried
Some members of Council had turned in a list of
their main fravel work for 1966, but there was not time
to review s me In detail at this meeting Mr Schmelke
reported th t his main project would be in his division
on the Troc u west road at a rate of 150 to 200 cu yds
per mile all the way
Mr. Peters moved that this meeting do now adjourn.
Time of adj urnment 6 o?clock P.M. Carried
eeve
Next Meeting Monday, June 13th, 1966 - 9 00 A.M
FORM 1�4 -P SPECIAL
MU ICIP SUPPLIES LTD,
snn "
REPORT OF
BUD HOPE
CONTID
3 HILLS
SHOP
EAVESTROUGH
GRAVEL
WORK
ADJOURN
v